Source: Haigang District Today
In order to further enhance the regional value, Duzhuang Town has been committed to improving the construction of the traffic network in 2019, and achieved outstanding results.
Building a “ring” main road
The Municipal Transportation Bureau renovated North Logistics Road from May 1, 2019, to support the construction of the Shougang Racing Valley project, extending to Zushan Road, with a total length of 3.051 kilometers.
The staff of the relevant departments of Duzhuang Town worked overtime in order to complete the road construction as scheduled, and the clear work of 120 land plots in nearly 100 mu has been finished.
The renovated North Logistics Road was renamed the Racing Valley Avenue, with the two-way four-lane standard. The signs, bus stops, and landscaping on both sides of the road were standardized. The road is flat with a wide vision, which brings great convenience to racing events and spectators.
(Shougang Racing Valley Avenue)
Former South Logistics Road was renamed Xingmin Street, extending west to Zushan Road and east to Xigang Road. At present, the 1km section from Zifeng Shuipan to Xingcheng Road has been completed, and the rest west section and the section from Gaozhuang Roundabout to North Xigang Road is planned to be completed by 2020.
(Xingmin Street, Xingcheng Road and other ancillary roads of Beixinzhuang Reconstruction Project)
A “ring” traffic pattern with Qinqing Highway, Zushan Road, Racing Valley Avenue, and Xingmin Street as the main roads will be formed after the completion of the project, which will greatly facilitate the travel of the people in this area and the tourists from other places.
Building “interconnected lines”
The road of the Hot Spring Town designed and constructed by the District Transportation Bureau starts from Jinlong Hot Spring Resort, bypass Sanyizhuang Village to Shimenzhai connection line, linking Heishanzui, Sanyizhuang and other villages rich in hot spring resources, which is not only convenient for villagers, but also lays a foundation for transportation for the subsequent development of hot spring resources.
(Road of the Hot Spring Town )
The strategic road from the Shimenzhai connection line to Wenquanpu Village is the renovation project of the old road, which not only facilitates the transportation of resident troops in the jurisdiction, but also brings convenience to the people along the line. At present, the bus 810 has been operated in this section.
(The Strategic Road)
The construction of three sections from Xiaojiagang Village to Changxingdian Village, Xiaojiagang Village to Jiaozhuang Village , and Xuzhuang Village to Chuhai Road have been completed to smooth the traffic among these villages.
Xiaojiagang Village to Changxingdian Village , to Jiaozhuang Village, Dongxuzhuang Village to Chuhai Road)
“One resolution for one issue” optimizes and improves the transportation environment
At the same time, relying on the policy of “One resolution for one issue”, Duzhuang Town applied for 7 projects of Bridge and Culvert and Pavement Hardening in Wujiafang Village, Bridge and Culverts in Jiangjiawa Village, River Dam in Mazhuang Village, Solar Street Light in Balinggou Village, Road and Bridge in Xiaojiagang Village, Road Hardening in Zazi Buluo Village, and Road Hardening in Shanqian Village, with an allowance of 1.84 million yuan from higher authorities.
At present, all 7 projects have been completed and passed inspection.
(Before and after the construction of Wujiafang Village)
The road is playing a vital role in the prosperity of all industries, which not only brings convenience to the people and improves the living environment, but also strengthens the mutual exchanges and promotes regional development potential. The future of Duzhuang Town will be better!
International Channel
http://www.qhdnews.com/en/index/
International Channel Mobile Client
http://www.qhdnews.com/en/mobile
Chinese manuscript